Additional information
Weight | 0.7 lbs |
---|---|
Dimensions | 8 × 4 × 3 in |
Waterproof | Yes |
Starting At: $17.38 USD
Our transconnect cables are perfect for running power from your transformer to your lighting. Available in lengths from 20 ft – 60 ft so no matter your lighting setup, we have a connector cable to fit your needs.
Weight | 0.7 lbs |
---|---|
Dimensions | 8 × 4 × 3 in |
Waterproof | Yes |
Only logged in customers who have purchased this product may leave a review.
Click here for most current information: WARRANTY POLICY.
2655 S. Santa Fe Unit 4-A
Denver, CO 80223 USA
DEKOR®️ Canada Fulfillment
205 Champagne Drive, Unit 3A
Toronto, ON, M3J 2C6, Canada
Toll Free: 1-800-258-0344
Copyright 2024| Privacy Policy | Accessibility Statement | WordPress Web Design & Hosting Santa Barbara
This is a device to be used every 20’ that enhances the signal to create pure colors from the first light to the last.
Yes, you can add to your current non-RGBW DEKOR lighting system by adding RGBW lights! While the non-RGBW DEKOR lighting system is a 2-wire direct current system, and the RGBW DEKOR lighting system is a 3-wire direct current system, you are able to integrate both systems by creating a separate zone. Either using a splitter running from you current transformer or upgrading to a 100 or 200 watt transformer, which has more than one output from the transformer, you can create an additional zone or zones. Please call us if you need us to walk you through this!
Bret S. (verified owner) –
Forrest (verified owner) –
Good product but shipping very expensive
Al F. (verified owner) –
Eric Sanders (verified owner) –
Great product
Garnet M. (verified owner) –
All pieces integrated easily together and with next generation LED’s provide a nice lighting package.
Kyle DePasquale (verified owner) –
Michael D. (verified owner) –
Christopher J. (verified owner) –
Jason J. (verified owner) –
Riley Keaton (verified owner) –
Anonymous (verified owner) –
Jesse W. (verified owner) –
Worked great for our application…easy plug and play!
Linda D. (verified owner) –
Darrell Kinchelow (verified owner) –
So far so good
JOHN ANGIULO (verified owner) –
Douglas (verified owner) –
Great system – used to repair damage done by pavers
john h. (verified owner) –
Mike A. (verified owner) –
Plug and play wiring is great.
Cletus Breeding (verified owner) –
Parisa Alavi (verified owner) –
Frederick Schutte (verified owner) –
Steven Chizzoniti (verified owner) –
thomas sheen (verified owner) –
Joseph B. (verified owner) –
works
Lori (verified owner) –
Great product. Would be nice if they came in shorter length options.