Existing Stock Transformer to Connector Long Leads @ Blowout Pricing (While Supplies Last)

SKU: EZPNPxxTRANSCONN

Starting At: $34.76 USD

Clear

Save now with blowout pricing on these existing single wire cables while supplies last. Blowout cables are non-returnable/final sale.

Our transconnect cables are perfect for running power from your transformer to your lighting. Available in lengths from 20 ft – 60 ft so no matter your lighting setup, we have a connector cable to fit your needs.

DEKOR® Lighting is transitioning to new and improved wiring, replacing clear (single wire) with black heavy duty (2-wire). We carefully designed this new system to be backwards compatible with our current clear wire cables.

Want to buy the new cables? Click Here

Additional information

Weight .7 lbs
Dimensions 8 × 4 × 3 in
Waterproof

Yes

Click here for most current information: WARRANTY POLICY.